We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Step correction work.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Step correction work - List of Manufacturers, Suppliers, Companies and Products

Step correction work Product List

1~4 item / All 4 items

Displayed results

[Construction Case] Logistics Center: Floor Leveling Work for Concrete Slab

Forklift operation is possible immediately after construction completion! The unevenness caused by the earthquake has been corrected in a short period.

Here is an example of "floor level adjustment work" carried out at a logistics center in Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, floor subsidence occurred. This subsidence caused a height difference, making it difficult for forklifts to operate for transporting goods. Using two trucks loaded with Upcon equipment, we swiftly corrected the subsidence. Immediately after the completion of the work, forklift operation became possible. 【Case Overview】 ■ Construction Area: Approximately 1798.5m2 ■ Maximum Subsidence: 107mm ■ Area: Logistics center in Kumamoto Prefecture ■ Construction Period: 6 days *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Kawaguchiko IC L5 Lane: CO Pavement Slab Step Differential Settlement Correction Work

Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.

We would like to introduce a case of "CO pavement slab step depression correction work" conducted at the Kawaguchiko IC L5 lane on the Chuo Expressway Fujiyoshida Line in Yamanashi Prefecture. The construction period was one day. Step correction of the CO pavement slabs within the toll booth was carried out. After traffic regulation, a construction plant vehicle was positioned within the toll booth for the work. Please feel free to contact us if you have any requests. 【Case Overview】 ■ Area: Chuo Expressway Fujiyoshida Line Maintenance Work Kawaguchiko IC L5 Lane ■ Construction Period: 1 day (April 2011) ■ Client: Central Japan Expressway Company ■ General Contractor: Central Japan Highway Maintenance Company *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Leveling Correction] Leveling correction of concrete floors "Teratec Method"

We will quickly correct dangerous floor level differences in warehouses, factories, and stores without damaging the floor and without stopping operations. We provide services nationwide in Japan, 365 days a year.

The unevenness of concrete floors in factories, warehouses, and stores can hinder the smooth operation of forklifts, carts, and hand trucks, potentially leading to decreased work efficiency and compromising employee safety. With the "Teratec Method," we can correct these "unevenness" issues in a short time without breaking the floor and without stopping operations. **Features of the Teratec Method:** For concrete floors with issues such as tilting and sinking, we drill holes smaller than a one-yen coin and inject a special urethane resin called "Teratec Resin." The injected resin expands and spreads beneath the floor, filling voids (gaps). By injecting more resin, the expansion force of the resin lifts the floor back up to level. The resin can withstand a load of at least 19 tons per square meter. After the work is completed, it is possible to operate forklifts immediately. We can carry out the work on holidays, during year-end and New Year’s, and at night. We perform the work without breaking the floor and without interrupting regular operations. Please feel free to contact us. Toll-free number: 0120-873-835

  • step_1.jpg
  • step_2.jpg
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Highway Toll Booth Concrete Pavement: Leveling Work

An example of quickly correcting the unevenness in the concrete pavement slab at a highway toll booth!

We would like to introduce a case of "leveling repair work" conducted on the concrete pavement slab at a toll booth on the expressway in Ehime Prefecture. Due to ground subsidence, a height difference occurred in the concrete pavement slab at the toll booth, affecting the passage of vehicles. We injected polyurethane resin under the subsided concrete pavement slab and corrected the 30mm height difference in a short period of time. 【Case Overview】 ■ Construction Area: 12m2 ■ Construction Period: 1 day ■ Maximum Height Difference: 30mm *For more details, please refer to the PDF document or feel free to contact us.

  • Other contract services
  • Exhibition planning/construction
  • Calibration and repair

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Related Categories of Step correction work